J. HERBERT STRANG
244 Prescott
Livingston, TX 77351
j.herbstrang@yahoo.com
Summary of Experience:
Over thirty years of experience in the project and turnaround areas
of petroleum refining, gas refining, petrochemical, power and
commercial construction. Experience includes project controls
management, change management, project coordination,
construction engineering, planning, scheduling, supervision, cost
control, material control, document control, quality, estimating,
contracting, logistics, scope development/justification and
purchasing.
Work Experience:
Innovative Turnaround Controls
Air Liquide La Porte 2016 Turnaround, SMR Plant, La Porte, TX Jun 2016 to Jul 2016
Turnaround Planner
Responsibilities include creation and development of electronic turnaround framework (to reside on
share drive – intranet) that includes job pack configuration and planning tools to be included in job
packs. Since this is the first turnaround for this plant and since very late start on planning effort, cut
straight identifying material (especially long leads), craft, crane, scaffold, insulation needs. Continued
to establish planning team infrastructure so client resources could continue development into turnaround
execution.
Chicago Bridge & Iron Company
OxyChem La Porte 2016 LP VCM TPO, VCM Plant, La Porte, TX Nov 2015 to Jun 2016
Turnaround Scheduler
Responsibilities include development and management of integrated execution schedules that include
maintenance operations imported from SAP, development of work centers for planning team, startup
and shutdown sequencing from operations. Reports are developed and presented to management as
well as supervision and engineering.
OxyChem Deer Park 2015 DP VCM TPO, VCM Plant, Deer Park, TX June 2015 to Nov 2015
Turnaround Scheduler
Responsibilities include development and management of integrated execution schedules that include
maintenance operations imported from SAP, capital projects imported from Micro Soft Project – Excel
meeting notes, startup and shutdown sequencing from operations. Reports are developed and
presented to management as well as supervision and engineering.
OxyChem La Porte North Pure Outage, VCM Plant, La Porte, TX Apr 2015 to Jun 2015
Turnaround Scheduler
Responsibilities include development and management of integrated execution schedules that include
maintenance operations imported from SAP, capital projects imported from Micro Soft Project – Excel
meeting notes, startup and shutdown sequencing from operations. Reports are developed and
presented to management as well as supervision and engineering.
OxyChem Ingleside CoGen, ChlorAlkali, VCM Plant, Ingleside, TX Dec 2014 to Apr 2015
Turnaround Scheduler
Responsibilities include development and management of integrated execution schedules that include
maintenance operations imported from SAP, capital projects imported from Micro Soft Project – Excel
meeting notes, startup and shutdown sequencing from operations. Reports are developed and
presented to management as well as supervision and engineering.
Koch Specialty Plant Services, Inc.
Marathon Petroleum Company, Galveston Bay Refinery, Texas City, TX Aug 14 to Oct 14
Material Coordinator
Reconciled submitted Bills of Material against client SAP material reports. Submitted revised Bills of
Material by category since they had not ordered much of it. Coordinated between client warehouse
entities, client material group field execution. Developed tracking and status tools. Consolidated
materials from various sources into units for each individual work order / column. Developed
continuous improvement matrix for inclusion in execution plan for next turnaround.
Marathon Petroleum Company, Galveston Bay Refinery, Texas City, TX Apr 14 to Aug
QA Coordinator
Assembled preliminary execution and quality job packages as deliverables became available from
client. Trained in client applications to find drawings and other needed documents. Aided planning by
performing material take offs including field verification of accessible isolation locations. Developed
scope “cheat sheets”, tracking charts, action items lists, wall charts. Provided guidance in use of
Primavera and MSExcel software.
Chicago Bridge & Iron Company
Marathon Petroleum Company, Texas City, TX Feb 14 to Mar 14
Turnaround Night Shift Equipment Coordinator
Monitored and tracked rental equipment. Arranged repairs and fueling for same. Coordinated
movements and removal of rental equipment, mobile equipment and gas cylinders.
Chicago Bridge & Iron Company
Marathon Petroleum Company, Texas City, TX Mar 13 to Mar 14
Project Planner Scheduler
Based on issued for construction engineered projects: estimated labor and materials requirements.
Liaison between engineering and construction. Performed job walks with execution contractors.
Developed execution plans in P6.
Shaw Group, Inc.
OxyChem Deer Park VCM Plant, Deer Park, TX Apr 12 to Mar 13
Turnaround Scheduler
Responsibilities include development and management of integrated execution schedules that include
maintenance operations imported from SAP, capital projects imported from Micro Soft Project, startup
and shutdown sequencing from operations. Reports are developed and presented to management as
well as supervision and engineering.
OxyVinyls ChlorAlkali Battleground Plant, LaPorte, TX May 11 to Apr 12
Turnaround Scheduler
Responsibilities include development and management of integrated execution schedules that include
maintenance operations imported from SAP, capital projects imported from Micro Soft Project, startup
and shutdown sequencing from operations. Also, included are training and presentation sessions for
client and other contractors. Reports are developed and presented to management as well as supervision
and engineering.
Infinity Construction Services
ExxonMobil AgriFos Environment Project, Pasadena, TX Aug 09 to Jan 10
Isometric Draftsman
Responsibilities included generating isometric piping drawings from client 3D model and from field
dimensions. Additional responsibilities included status reporting and interface with client engineers and
management.
Infinity Maintenance Services (Brazos M&E, US Contractors)
ExxonMobil Baytown Refinery, Baytown, TX Apr 07 to Aug 09
Turnaround Planner
Developed budgets and schedule from Class V (30%) estimate to final Class 2 (detail planned) budget.
Managed change via Change Order Dbase. Interfaced with contract detail planners and other planning
team members. Lead and scribed meetings. Maintained budget development log. Tracked planning
progress. Generated various levels of reporting for cost and labor units. Participated in various external
reviews and Pertmaster analysis of each PrimaVera project. Developed preliminary job packs then
handed off to execution contractors for final job pack development.
ExxonMobil Baytown Olefins Plant, Baytown, TX Nov 99 to Apr 07, Jan 10 to May 11
Turnaround Planner, Startup Scheduler, Lead Planner, Project Controls Manager
Along with client TA Manager, developed new Turnaround Team and tools used by same. Performed
numerous stages of estimates used to test 4, 6, 8 year run length scenarios. Scrutinized worklists and
developed Turnaround Work Justification tools, monitored scope and cost development. Developed
budgets from Class V (SWAG) through final budgets. Studied impact and definition of indirects.
Developed program to eliminate accrual of state sales taxes on turnaround costs. Developed and
maintained detail planning strategy and progress matrix. Interface between multidiscipline detail
planning team and management. Developed logistics plans. Developed contract strategies and
furnished scope, cost, labor needs to client corporate contract group for release to continuing service
agreement (CSA) contractors. Developed contract packages for non CSA contractors. Developed job
pack planning tools and deliverables. Developed planning and scheduling procedures. Championed
planning team during external reviews. Developed planning overview matrices and schedules.
Stewarded Planning And Execution Framework guidelines for team. Tested and aided in development
of Corporate Planning And Execution Framework. Provided "what if" cost and schedule studies to
management. Developed safety incentives packages. Oversaw and produced integrated execution
budgets and schedules. Monitored and reported planning team progress. Liaison between corporate,
engineering, planning, execution, purchasing, contracting, process operations, teams. Awarded 2006
Safety Champion award. Lead multidiscipline, multicontractor, and owner representatives planning,
scheduling and cost team. Lead weekly, monthly planning strategy and progress with team and with
management. Conducted post turnaround critique sessions and combined into post turnaround critique
product. Produced post turnaround metrics for management. Tracked productivity based on actual
manhour expenditures VS planned manhour earnings. Participated in cost forecasting. Maintained
change order system during execution.
US Contractors Home Office, Clute, TX Oct 99 to Nov 99
PlannerScheduler
Developed bid schedules based on home office estimates.
BASF, Clute, TX Aug 99 to Oct 99
PlannerScheduler
Developed and maintained integrated turnaround schedule based in field planning inputs from planners.
Turnaround Planner Consultant (BRIS, Chillura & Associates, Collins Technical Associate, JE,
Kelly Technical Associates, UE&C Catalytic, Raytheon Constructors Inc., TSI)
Altair Strickland Inc Deer Park, TX Jun 99 to Aug 99
Bid Scheduler
Developed bid schedules based on home office estimates.
Amoco Refinery, Texas City, TX Jan 96 to June 99
Turnaround Planner, Capital PlannerScheduler, Project Engineer, Project Coordinator
Entered facility as turnaround planner but was quickly swept to capital projects as assistant to client
project engineer. Was seconded as client employee, had client blues and business cards. Liaison
between client engineering, contract engineering, client field employees and contract execution forces.
Participated in constructability reviews, scheduling of engineering deliverables, managed development
of execution schedules. Authorized expenditures of company funds. Transitioned to a project engineer
role reporting to the Amoco Worldwide Engineering & Construction local regional manager of capital
projects. Interfaced and resolved issues with GDS home office project engineer and their troops.
Participated in "melding" of new EPC alliance with Bechtel. Liaison between alliance groups, company
personnel and execution contractor. Developed integrated team between Amoco heritage factions,
alliance engineering, alliance execution forces and other contractors. Developed contracting/execution
strategy. Conducted team building with corporate facilitators. Monitored planning and schedule
progress and direction.
Lagoven Refinery, Punto Fijo, Venezuela Dec 95
Turnaround Planner
Developed field plans and preliminary bid grade schedule and estimate for Turnaround Bid Package.
BP Refinery, Oregon, OH Mar 95 to Nov 95
Turnaround Planner
Developed field plans and integrated execution schedule. Coordinated execution activities in field.
Eagle Point Refinery, National Park, NJ Jan 95 to Mar 95
Turnaround Planner
Resolved contractor's inability to bill for progress due to failure to link schedule and budget. Developed
and maintained execution schedule.
Citgo Asphalt Plant, Paulsboro, NJ Aug 94 to Dec 94
Turnaround Planner
Developed execution schedule based on detail planners inputs. Maintained schedule change orders for
input to schedule during execution.
Texaco Refinery, Torrance, CA Jul 94 to Aug 94
Turnaround Planner
Developed execution schedule and cost breakdown structure from engineering package. Trained project
engineer in understanding of planning scheduling tools.
Unocal Refinery, Carson, CA May 94 to Jul 94
Turnaround Planner
Resolved issues between primary mechanical contractor and client. Contractor could not show
attainment and could not bill for progress. Developed and maintained detail completion schedules for
transition from area to system concepts. Developed and maintained hydrotest package tracking system.
Oxy VCM Unit, Deer Park, TX Aug 93 to Apr 94
Turnaround Planner
Developed schedule based on field planning by site maintenance contractor. Maintained schedule
through execution. Performed schedule software comparison tests for client.
Texaco Refinery, Bakersfield, CA Jul 93 to Aug 93
Turnaround Planner
Field planned and revised "library" plans in budget schedules. Conducted schedule reviews with client
and obtained mechanical contractor buyin to execution scheduled. Maintained schedules during
execution.
Oxy VCM Unit, Deer Park, TX Apr 93 to July 93
Turnaround Planner
Developed "whatif" schedule studies for upcoming turnarounds.
Chevron Refinery, Port Arthur, TX Jun 92 to Apr 93
Turnaround Planner
Developed schedule based on field planning by site maintenance contractor. Maintained schedule
through execution.
Phibro Refinery, Texas City, TX Dec 91 to Jun 92
Turnaround Planner
Trained newly formed turnaround group in use of planning tools. Field planned and developed
schedule for upcoming turnaround.
Hill Petroleum Refinery, Houston, TX Jun 91 to Dec 91
Turnaround Planner
Assembled turnaround planning group and planning tools. Responsible for field planning and input to
execution schedule. Responsible for planning and schedule group through turnaround execution.
Allied Waste/Specialized Waste Systems Houston, TX Sep 89 to Jun 91
Project Manager
Responsible for obtaining, developing and executing environmental projects. Maintained customer
relations throughout project and ongoing basis.
Turnaround Planner Consultant
BP Refinery Lima, OH Mar 89 to Aug 89
Turnaround Planner
Developed field plans and integrated execution schedule. Coordinated execution activities in field.
Amoco Refinery Texas City, TX Jan 88 to March 88
Turnaround Planner
Trained on use of computer and input of field planning into XEDIT word processor for download into
SASS scheduling program. Monitored progress during execution.
Arco Refinery, Houston, TX Oct 87 to Dec 87
Pipe Fabricator
Worked a shutdown while waiting for next one.
Sohio Refinery Oregon, OH Jun 87 to Sep 87
Purchasing Agent, Turnaround Planner
Purchased consumables and rental items during logistics stage of pre TA. Was attached to company
planner during TA for resolution of issues on night shift. Performed updates for night shift.
Bay Maintenance Co, Inc.
3M Research Facility Austin, TX Feb 87 to Jun 87
Project Superintendent
Responsible for quality and execution of multidiscipline crews that moved in and out from other sites.
FosterWheeler/PPC
City of Austin Waste Water Treatment Plant Austin, TX Feb 86 to Feb 87
QA/QC Superintendent
Developed QA/QC program for first nonprocess plant contracts obtained by company. Responsible for
quality of all installed materials. Liaison between engineering, client, client, management company, the
project and other contractors.
StearmsRogers Catalytic/PCC
Citgo Refinery Lake Charles, LA Sep 85 to Feb 86
Turnaround Planner
Responsible for field planning that was incorporated into execution schedule. Coordinated activities
during execution. Performed project closeout.
Exxon Company, USA Shute Creek Natural Gas Plant, Shute Creek, WY
Stearns Rogers Module Fab Plant Pocatello, ID Mar 85 to Sep 85
Construction Engineer
Developed quality packages. Responsible for quality of modules shipped from facility.
Badger/PPI
Koch Refinery Corpus Christi, TX Oct 84 to Feb 85
Planner Scheduler
Developed detail execution schedules from overall schedule. Interface between management group and
field execution forces.
Ortloff Corp.
Amerada Hess CO2 Recovery Plant Seminole, TX Feb 84 to Oct 84
Cost Surveyor, Assistant Area Superintendent
Monitored installed quantities and progress. Developed tracking system for manhours spent on
engineering or fabrication deficiencies. Transitioned to field coordination for area
superintendent.
Bechtel/BeCon
Houston Lighting & Power Generating Station Jewett, TX Sep 82 to Feb 84
Construction Engineer, Planner Scheduler
Liaison between engineering, client, and execution forces. Responsible for quality of installed
quantities for pipe then civil. Transitioned to planning and scheduling in latter stages of
execution. Issued detail completion schedules until completion of project.
Fish Engineering and Construction, International
Phillips Chemical Plant Deer Park, TX June 82 to Sep 82
Area Superintendent
Developed hydrotest packages and coordinated hydrotesting.
Arco Natural Gas Plant Freer, TX Mar 82 to Sep 82
Construction Engineer
Liaison between engineering, client, and execution forces.
Valero Chemical Plant Corpus Christi, TX Jan 82 to Mar 82
Assistant Construction Engineer
Liaison between engineering, client, and execution forces. Coordinated hydrotesting.
Fish Engineering and Construction, International Home Office June 80 to Sep 81
Sr. Material Controller
Bechtel/BeCon
Cominco America Fertilizer Plant Borger, TX Jan 80 to Jun 80
Lead Pipe Foreman
Responsible for all activities of pipe crew. Liaison between engineering and field execution.